Aircraft > Jet > Boeing > N908BH: Boeing BBJ2
• Second Owner Since New • FAA Part 91/135 and EU OPS-1 compliant • 17 Passengers (FAA Part 135) and 18 Passengers (FAA Part 91 and EASA EU-Ops-1) • Hi-Speed Internet Connection & Airshow ASXi • Extensive Cabin Refurbishment in 2015
Honeywell and Collins avionics are under programs. • ACARS: One (1) Teledyne 8400021-30-B • ADF: Dual (2) Collins ADF-900 • ADL: One (1) Teledyne EADL (USB) • ADS-B Out V2 • CVR: One (1) L3 Com 2100-1020-00 • DFDAU One (1) Teledyne 2233000-815 • DME: Dual (2) Collins DME-900 • EGPWS: One (1) Honeywell Mark V 965-1690-055 • FDR: One (1) L3 Com 2100-4043-00 • FMC: Dual (2) Smiths 176200-01-01 • GPS SBAS Receivers GLU-2100 • HF: Dual (2) Collins HFS-900 • HGS: One (1) Flight Dynamics Heads-Up Guidance System Model HGS-4000 • RADAR: One (1) Weather Radar Collins WRT-701X • SBAS GPS: Dual (2) Collins GLU-2100 • TCAS: One (1) TCAS 7.1 Collins TTR-2100 • VHF: Triple (3) Collins VHF-900B • VOR: Dual (2) Collins VOR-900 • XPNR: Dual (2) Collins TPR-901 AVIONICS HIGHLIGHTS: • TCAS 7.1 compliant with TTR-2100 installed via Boeing SB. • ADS-B OUT V2(DO-260B) compliant. • FANS-1 compliant over L-Band Satcom (MCS-7147) via Boeing SB. • Compliance with ADS-B OUT V2 (GNSS Performance Requirement).
Entry Into Service: September/2002 Airframe Total Time: 5,223 Hours Landings: 1,660 Cycles Times current as of September 5th, 2024 Mfr/Model: Boeing B737-DV, BBJ2 Variable Number: YD406
CFM International CFM56-7B27B3 Engine 1: 888608 Engine 2: 888609 5,223 Hours 5,223 Hours 1,660 Cycles 1,660 Cycles Engine 1 & 2 First Limiter: 10,300 Cycles • Original engines installed.
• VVIP Interior Installation CABIN ENTERTAINMENT • Original Cabin Management System (CMS) from Lufthansa Technik. • Upgrade of IFE to Collins Venue System in 2015 ( Phase I) and 2019 (Phase II). • Hi-Speed internet connection–Dual SBB Honeywell HD-710 (Honeywell satcom MCS-7147). • Airshow ASXi (included in Collins Venue IFE). • Freshly painted by King Aerospace in April 2022
• Pats Auxiliary Fuel Tanks - 6 Tanks (2 In Fwd Cargo And 4 In Aft Cargo) • JetAire Invicta Foam Ignition Mitigation Modification to centre tank • Cargo Fire Suppression • Head-up Guidance HGS-4000 • TIOS Antenna (Vertical Fin) Installation • Cabin Wireless Local Area Network (LAN) • EASA-mandated Fuselage ULB Installation - for FAA Part CP • Reinforced Flight Deck Door - for FAA Part 135 CP • Cockpit Door Surveillance System - for FAA Part 135 CP • Handrails installed for FAA Part 135 CP